Guide · 8 min read
How to get land allocated in a Local Plan
Allocation in an adopted Local Plan is usually the highest-value planning outcome available to a landowner, because it establishes the principle of development in policy rather than fighting it application by application. Getting there depends heavily on timing.
The plan-making stages
Plan preparation in England follows a defined sequence. Knowing which stage an authority has reached tells you whether a site can still realistically be promoted into the plan.
- Evidence gathering — studies commissioned, Call for Sites usually runs at or before this point.
- Regulation 18 — issues and options consultation; site options are still open.
- Draft plan and Regulation 19 — the publication version; representations are on soundness, not free site selection.
- Submission and examination — an inspector tests the plan; new sites are rarely introduced except through main modifications.
- Adoption — the plan becomes the development plan for decision-making.
The Call for Sites window
A Call for Sites is the authority's formal invitation for land to be submitted for assessment. Submissions are typically assessed through a Housing and Economic Land Availability Assessment (HELAA) or, for housing only, a Strategic Housing Land Availability Assessment (SHLAA).
Missing the window does not always end the matter, because authorities often run further calls, but a site that is not in the HELAA is not in the pool from which allocations are drawn.
What a HELAA assessment tests
HELAA methodology follows national guidance and is broadly consistent: the assessment asks whether a site is suitable, available and achievable.
- Suitability — policy designation, constraints, access, flood risk, landscape and heritage impact.
- Availability — whether the ownership is willing and the land is free of legal impediments.
- Achievability — whether development is viable within the plan period.
- Deliverability timescale — commonly banded across years 1–5, 6–10 and 11–15.
Making a submission that stands up
Authorities discount submissions they cannot rely on. A submission is stronger when it demonstrates control and deliverability rather than asserting them.
- A clear red-line boundary with area stated in hectares.
- Evidence of ownership or an option, and a statement of willingness to release.
- An indicative access strategy, with visibility splays where highway capacity is contentious.
- Initial constraint work: flood risk, ecology walkover, heritage screening, trees.
- A realistic capacity and phasing assumption using densities consistent with the local pattern.
If the plan is already at examination
Where a plan has reached Regulation 19 or examination, the practical routes are representations on soundness (for example on housing requirement, land supply or the deliverability of allocated sites), promotion into the next plan review, or a planning application relying on the tilted balance where the authority cannot demonstrate a five-year supply.
Common questions
- What is a Call for Sites?
- A Call for Sites is a formal invitation from a local planning authority for landowners and promoters to submit land for assessment as part of Local Plan preparation.
- What is the difference between a HELAA and a SHLAA?
- A SHLAA assesses land availability for housing. A HELAA covers housing and economic development land in a single assessment, and is the approach set out in current national guidance.