Skip to content

London

London Borough of Wandsworth planning intelligence

Local Plan stage, adopted plan, plan period and published housing position for London Borough of Wandsworth, read from the national planning data platform on 20/09/2026.

Authority dashboard

Local Plan stage

Examination — near the end

Closed — only omission sites raised through hearings.

Five-year supply

Data currently unavailable

Source: planning.data.gov.uk local-plan and local-authority datasets

Housing Delivery Test

123%

Source: planning.data.gov.uk local-plan and local-authority datasets

Annual housing requirement

1,354homes pa

Source: planning.data.gov.uk local-plan and local-authority datasets

Plan-making and delivery position

How favourable is this authority's position for promoting land right now?

  • Local Plan progressExamination — near the end

    An independent inspector is examining the plan. Hearing sessions, main modifications and a further consultation on modifications typically follow before adoption.

  • Five-year housing land supplyData currently unavailable

    No supply statement is published in our sources for this authority.

  • Housing Delivery Test123% delivered

    At or above 95% of the requirement delivered.

  • Evidence coverage held91%

    3 planning documents indexed for this authority.

What does this mean?

Read the plan stage first: allocation routes narrow considerably once a plan reaches examination.

Source: planning.data.gov.uk, MHCLG Housing Delivery Test and authority evidence base · Updated: Sept 2026 · Confidence: 91% evidence coverage

Local Plan stage

Examination — near the end

An independent inspector is examining the plan. Hearing sessions, main modifications and a further consultation on modifications typically follow before adoption.

Submitting land: Closed — only omission sites raised through hearings.

Published position

Local Plan stage
Examination — near the end

An independent inspector is examining the plan. Hearing sessions, main modifications and a further consultation on modifications typically follow before adoption.

Source: planning.data.gov.uk (Open Government Licence) · dated 2023-07-19

Adopted development plan
Wandsworth Local Plan 2023-2038

Source: planning.data.gov.uk (Open Government Licence) · dated 2023-07-19

Emerging Local Plan
Wandsworth Local Plan

Source: planning.data.gov.uk (Open Government Licence)

Plan period
2023 to 2038

Source: planning.data.gov.uk (Open Government Licence)

Housing figure in the plan document
20,311 homes

Source: planning.data.gov.uk (Open Government Licence)

Annual housing requirement
1354 homes a year

Source: planning.data.gov.uk local-plan and local-authority datasets · dated 2026-02-09

Five-year housing land supply
Data currently unavailable

Source: planning.data.gov.uk local-plan and local-authority datasets

Housing Delivery Test
123%

Source: planning.data.gov.uk local-plan and local-authority datasets · dated 2026-08-17

Plan documents held nationally
3

Source: planning.data.gov.uk (Open Government Licence)

Where a figure has not been published in our sources it is shown as data currently unavailable. It is never inferred or estimated.

Development pressure & opportunity outlook

A 0-100 index of how much pressure London Borough of Wandsworth is under to release new land, built only from published evidence, followed by what that evidence means for promoting land here over the next 12-24 months.

Loading the evidence position…

Ask the Local Plan reader

Ask a question about London Borough of Wandsworth's indexed planning documents and get an answer with document, page and policy citations — never a summary without a source you can check.

What this means for a landowner

The plan stage tells you whether allocation is still realistically available. Early stages — evidence gathering and Regulation 18 — are when sites are selected, so a Call for Sites submission has the greatest effect. Once a plan reaches Regulation 19 or examination, the practical routes narrow to soundness representations, the next plan review, or an application relying on the authority's land supply position.

The housing figures matter for the same reason. An authority that cannot demonstrate a five-year supply, or that falls below the Housing Delivery Test thresholds, applies the presumption in favour of sustainable development differently — which is what practitioners mean by the tilted balance.

Common questions

What stage is the London Borough of Wandsworth Local Plan at?
Examination — near the end. An independent inspector is examining the plan. Hearing sessions, main modifications and a further consultation on modifications typically follow before adoption.
Can I still submit land to London Borough of Wandsworth?
Closed — only omission sites raised through hearings.
Can London Borough of Wandsworth demonstrate a five-year housing land supply?
No five-year housing land supply figure is currently published in our sources for London Borough of Wandsworth, so the position is reported as unavailable rather than assumed.

Other authorities in London

This assessment is an automated planning intelligence report based on available public data. It does not constitute planning, legal, valuation or other professional advice and does not guarantee that planning permission will be granted.